Ready Assembled Reaction Systems

Loadtest offer a range of reaction systems providing safe and rapid assembly to anchor piles for the load testing of foundation:

2MN ready assembled reaction system4MN
4-5.5MN reaction system12MN reaction system

Added safety is achieved by minimising the number of connections between the reaction system and the anchor piles and ensuring that they are at a level that is easily accessible from the ground.


Back

Project Profiles:

  • Al Rafi Towers
  • Dubai Tiara Towers
  • MAG 218 Tower
  • Al Durrah Tower, Trade Center 1
  • Dubai LRT - Retail Plaza Station

Upcoming Conferences:

  • Piling and Deep Foundations Saudi Arabia Nov. 07 - 10, 2009

News:

  • Tests Performed by LOADTEST exceeding 135 MN
  • Incheon Bridge Press Release
  • Fugro-Loadtest 2009 Recipient of the DFI's Ben C. Gerwick Award
© Copyright 2011, LOADTEST. All Rights Reserved. Design By Adbiz